Contact Us

2500 KVA Cast Resin Dry Type Transformer

General introduction of   2500 KVA Cast Resin Dry Type Transformer

This 2500 KVA cast resin dry type transformer was delivered to South Africa in 2018. The rated power of the transformer is 2500 KVA.

  • Introduction
  • Contact Now

Product Introduction

This 2500 KVA cast resin dry type transformer was delivered to South Africa in 2018. The rated power of the transformer is 2500 KVA. The primary voltage of the transformer is 11 KV and secondary voltage is 0.4 KV. It equipped with RS485 communication protocol temperature controller to monitor the operation condition of the transformers, our 2500 KVA Dry Type Transformer was designed with advanced technology and adopts high quality material and components which result in reliable quality and long operation time.


We ensure that each one of our delivered units has undergone rigorous full acceptance testing. We provide one-package service from consulting, quoting, manufacturing, installation, commissioning, training to after sale services, our products are now operating in more than 50 counties in the world. We aim to be your most reliable supplier as well as your best partner in business!


Advantages

Fire resistant /Self-extinguishing(F1)

Environmental class(E2) and climatic class (C2)

From IP00-IP56 enclosure with AN, AF, ANAF or AFWF cooling

Maintenance free

Environmental friendly ,>90% of material recyclable


Temperature control system

Built-in PT100 probes in 3 phase windings to detect the real-time temperature of windings and cycle display them in the digital screen.

Open circuit alarm and fault self-check alarm display and signal output.

3 stages automatically actions while the temperature reached to the set value, 1st stage the cooling fans start automatically, 2nd stage high temperature alarm,3rd stage over temperature trip.

Fans manual/auto control switch, timing start/stop, history data output.

4-20mA current output

RS485 Modbus communication protocol

Environment temperature measurement

Core temperature measurement


Scope of Supply

Product: resin cast dry type transformer

Voltage level: up to 35KV

Rating level: up to 20MVA

The transformer can be designed according to customer’s requirements


Technical Data Sheet

2500 KVA Dry Type Transformer specifications and data sheet

Delivered to

South Africa

Year

2018

Model

SCB10 -2500 KVA-11/0.4KV

Type

resin cast dry type transformer

Standard

IEC60076

Rated Power

2500 KVA

Frequency

50 HZ

Phase

Three

Cooling Type

AN/AF

Primary Voltage

11 KV

Secondary Voltage

0.4 KV

Winding Material

Aluminum

Vector Group

Dyn11

Impedance

6%

Tap Changer

NLTC

Tapping Range

±2*2.5%

No Load Loss

4 KW

On Load Loss

17.2 KW

Accessories

Standard Configuration


Finished 2500 KVA 11/0.4KV Transformer



Check before running

1. Check whether all fasteners and connectors are loose and tighten them again.

2. Check whether the parts removed during transportation are properly reinstalled, and check whether there are foreign bodies in the transformer, especially in the high and low voltage air duct of the transformer and on the underlying pad.

3. Check whether the fan, temperature controller, temperature indicator, on-load switch and other accessories can work normally. For the three-phase power fan, attention should be paid to its steering. When the fan is normally turning, the wind blows upward from the bottom of the coil into the line

Circle, otherwise, it will be reversed, please replace the phase sequence of the fan power.



How to solve the abnormal temperature rise?

1.Modify or replace the instrument

2.Reduce the load, balance the load of each phase, increase the transformer capacity

3. Change the wiring

4.Clean the dust


FAQ

1. Where is your main market?

We had exported our transformers to more than 30 countries in the world, our main market is Africa countries, South and North American countries, and Asia countries.

2. What certificate do you have?

We have KEMA, CESI, CTQC type test report for our transformers.

3. How long is your delivery time?

30 days after drawing confirmed by buyer for distribution transformers below 5000kva, bigger transformers depend on the capacity and components, normally 30-90days(with imported components)


Send us your detail requirements, we have professional service team to answer you ASAP!

Thank you for your attention on Vouchivan ELECTRIC!

We offer Oil immersed transformers, Dry type transformers, Compact transformer substations, etc.